Holmberg Technologies, Inc.
7161 Brookhaven Terrace
Englewood, FL 34224
Phone: 941-468-8802
dholmbrg@aol.com
Home
Video Files
Best Kept Secrets
Soft Shore Conference
Recent Projects
Image Gallery
Causes of Erosion Click to expand menu.
Independant Monitoring
Press Excerpts
Cost Comparisons
Engineering Click to expand menu.
Global Warming
Dr. Pilkey vs Army Corps
Great Lakes Beaches
Home Owner Rights Click to expand menu.
Frequent Questions
Links and Websites
Contact Us

        

The remaining seawall that was not removed for this project is shown here. This is north of the section of seawall that was removed on site B. This picture was taken on December 1, 1999 during removal and construction of the Undercurrent Stabilizer field. Waves were crashing up and over this wall before construction began.

The same remaining stretch of seawall to the north of site B after construction of the Undercurrent Stabilizer field was completed. The wall has been neutralized and now is burying under new sand accreting on and around this installation. A typical response to all Undercurrent Stabilizer installations.

NAJMAH BEACH PROJECT

Ras Tanura, Saudi Arabia

Previous Page
BACK NEXT

Copyright © 1999 - 2014  Holmberg Technologies, Inc.